Training for this procedure can be found in these courses:
241 – Intro to Cooling Systems Troubleshooting and 106 – Building Systems
STANDARD OF PERFORMANCE
Exterior equipment must (a) be located in clear area for operation, (b) not be exposed to excessive roof water runoff, leaf entry, etc., (c) be convenient to utilities and interior equipment, and (d) not create noise problem for occupants. Equipment location must meet code requirements.
PROCEDURE GUIDE