Training for this procedure can be found in these courses:
123 – Air Distribution and 205 – HVAC High Efficiency Ventilation
STANDARD OF PERFORMANCE
Ventilation air intake must be located in protected area. Length of intake duct must be minimized. Air intake must be equipped with balancing damper, weather cap and insect screen.
PROCEDURE GUIDE