HVAC Procedure and Performance Guide

TASK : Determine Type of Mounting System Required for Equipment

Training for this procedure can be found in these courses:     BHE Construction Technology   and   110 – Blueprints

STANDARD OF PERFORMANCE

Mounting system must conform to manufacturer’s specifications and job specifications.  Mounting system must incorporate vibration isolators where needed.

PERFORMANCE GUIDE

  1. Review job specifications, structural information and make site inspection.
  2. Review mounting-system options recommended by manufacturer.
  3. Select one most appropriate for installation.
  4. Determine if vibration absorbers are required.
  5. Document selection.