Training for this procedure can be found in these courses:
STANDARD OF PERFORMANCE
Heater sequencer must be installed according to manufacturer’s specifications. Sequencer contacts must be rated for heater voltage and current. Sequencer coil voltage requirements must be compatible with control system voltage. Sequencer must have auxiliary contacts as required by application. Sequencer must be securely mounted. Electrical connections must be mechanically secure and electrical continuity must be established. Sequencer must energize heating elements and auxiliary components as specified. Applicable safety procedures must be followed.
PROCEDURE GUIDE