HVAC Procedure and Performance Guide

TASK: Collect Job Materials.

Training for this procedure can be found in these courses:      109 – Basic Hand and Power Tools   and   Xcel Energy Quality Installation

STANDARD OF PERFORMANCE

Interior equipment must be located for ease of installation and access, convenience to utilities and access for duct connections.  Equipment must be located in an area where noise will have minimum impact on space occupancy.  Equipment location must meet code requirements.

PROCEDURE GUIDE

  1. Review specifications, sketches and layouts for designated job.
  2. Review equipment sizing.
  3. Prepare a materials list based upon Steps 1 and 2.
    1. Materials.
    2. Equipment.
    3. Supplies.
    4. Tools.
  4. Gather materials, equipment, supplies and tools, and check off list or make arrangements for items to be transported to job site.
    1. Ensure that small items are packaged securely.
    2. Ensure that items that might be damaged by exposure are protected.
    3. Ensure that items under pressure (welding cylinders, etc.) are properly capped and secured for transportation.
    4. Ensure that critical items are clearly marked.