STANDARD OF PERFORMANCE
Gas line must be pressurized from gas supply and then bled at furnace end until all air is removed from pipeline. Gas line must be free of air before equipment is placed in operation. Adequate ventilation must be maintained in furnace area to prevent accumulation of gas and explosive atmosphere. Applicable safety procedures must be followed.
PROCEDURE GUIDE