Training for this procedure can be found in these courses:
205 – High Efficiency Ventilation and 123 – Air Distribution
STANDARD OF PERFORMANCE
Evaporator must be securely installed in plenum according to manufacturer’s specifications. Coils must be pitched for condensate drainage and plenum must be equipped with condensate drain pain. When completed system is placed in operation, evaporator must perform according to manufacturer’s specifications. Applicable safety procedures must be followed.
PROCEDURE GUIDE