STANDARD OF PERFORMANCE
Main duct (rectangular rigid fiberglass) and fittings must be installed according to manufacturer’s specifications, job specifications and codes. Duct joints and seams must not leak. Applicable safety procedures must be followed.
PROCEDURE GUIDE
8. Connect duct sections and fittings.
9. Install takeoffs.
10. Insulate metal fitting if applicable.
11. Remove safety and protective equipment and apparel.
12. Gather tools, equipment and leftover materials and leave work site clean.