Training for this procedure can be found in these courses:
123 – Air Distribution and 205 – HVACR High Efficiency Ventilation
STANDARD OF PERFORMANCE
Filter connector must be installed according to manufacturer’s specifications and job specifications. Connector must not leak and must prevent transmission of vibration from equipment to duct system. Applicable safety procedures must be followed.
PROCEDURE GUIDE