Training for this procedure can be found in these courses:
STANDARD OF PERFORMANCE
Suction line accumulator must be located and installed according to manufacturer’s specifications and job specifications. Liquid refrigerant and oil slugs must not enter compressor. Connections must not leak and accumulator must not be insulated. Applicable safety procedures must be followed.
PROCEDURE GUIDE