Training for this procedure can be found in these courses:
STANDARD OF PERFORMANCE
Suction/liquid line heat exchanger must be located and installed according to manufacturer’s specifications and job specifications. Liquid sub-cooling requirements must be met and installation must not leak. Applicable safety procedures must be followed.
PROCEDURE GUIDE