Training for this procedure can be found in these courses:
STANDARD OF PERFORMANCE
Heat pump filter-dryer (biflow) must be located and installed according to manufacturer’s specifications and job specifications. Filter-dryer must be effective in removing solids, moisture and acids from refrigerant and oil within specified ranges. Installation must not leak. Applicable safety procedures must be followed.
PROCEDURE GUIDE